Contractor
Administrative District Office
Our Services
Concept
Design planning
Authorization
planning
Invitation
to tenders
Contract award
assistance
Construction
engineering
Starting Situation
Miltenberg was chosen for the location of a process waste
loading and unloading plant with adjacent recyc-
ling plant. In the waste loading and unloading plant, the refuse is pre-sorted,
cut up and loaded for transpor-
tation to thermal processing. Recycling material and problem refuse from
household and industry is accepted
at the recycling yard, sorted and put into interim storage.
Results
Planning and selection of suitable location: 1995 - 1998
Operation commencement: 1998
Facts and Figures
Planning and selection of suitable location: 1995 - 1998
Operation commencement: 1998
<