Project Assignment
Complete planning of a system for the thermal utilization of waste, trade and bulky refuse

Contractor
Gemeinschaftskraftwerk Schweinfurt GmbH

Our Services
Concept
Authorization planning
Implementation planning
Invitation to tenders / Assistance with awarding contracts
Construction supervision
Operation commencement supervision

Starting Situation
The three local industrial companies FAG Kugelfischer Georg Schäfer KGaA, Fichtel & Sachs AG and SKF
GmbH and the city of Schweinfurt were forced to replace various older heating plants and cogeneration
plants which in part could no longer qualify for operation authorization. This situation led to the idea of
constructing a joint-venture power generating plant. Industry and community joined together in order to
guarantee the district heating supplying of the industry and city and for the generating of electricity.

Results
A new coal firing cogeneration plant was built with an attached system for the thermal utilization of waste
refuse which can be supplied the entire year through the district heat ground load. The emission from the
power plant is controlled regularly for harmful pollutants. High-technology in conjunction with an integrated
multiple redundant steering and control technology along with a qualified operations team guarantee a
trouble-free and low-emission power plant operation.


Facts and Figures
Planning and construction period: 1988 - 1993
Commencement operation and trial operation: I/II Quarter 1994
3 Waste boiler: 178.000 t/a
Steam capacity: 3x20 t/h
Fresh steam parameter: 65 bar, 450°C
Flue gas cleaning system:
    pre-dust removal
    spray-drying
    fabric filter
    2-step wet-washing process based on limestone SNCR technology for NOx reduction
Steam turbo units of power plant
    1 extraction back-pressure turbine: 12 MW
    1 extraction condensation turbine: 17 MW
District heating capacity of cogeneration plant 110 MW