Project Assignment
Complete
planning of a system for the thermal utilization of waste, trade and bulky
refuse
Contractor
Gemeinschaftskraftwerk Schweinfurt GmbH
Our Services
Concept
Authorization
planning
Implementation
planning
Invitation
to tenders / Assistance with awarding contracts
Construction
supervision
Operation commencement
supervision
Starting Situation
The three local industrial companies FAG Kugelfischer Georg
Schäfer KGaA, Fichtel & Sachs AG and SKF
GmbH and the city of Schweinfurt were forced to replace various older
heating plants and cogeneration
plants which in part could no longer qualify for operation authorization.
This situation led to the idea of
constructing a joint-venture power generating plant. Industry and community
joined together in order to
guarantee the district heating supplying of the industry and city and
for the generating of electricity.
Results
A new coal firing cogeneration plant was built with an
attached system for the thermal utilization of waste
refuse which can be supplied the entire year through the district heat
ground load. The emission from the
power plant is controlled regularly for harmful pollutants. High-technology
in conjunction with an integrated
multiple redundant steering and control technology along with a qualified
operations team guarantee a
trouble-free and low-emission power plant operation.
Facts and Figures
Planning
and construction period: 1988 - 1993
Commencement operation and trial operation: I/II Quarter 1994
3 Waste boiler:
178.000 t/a
Steam capacity:
3x20 t/h
Fresh steam
parameter: 65 bar, 450°C
Flue gas cleaning
system:
pre-dust removal
spray-drying
fabric filter
2-step wet-washing process based on limestone
SNCR technology for NOx reduction
Steam turbo
units of power plant
1 extraction back-pressure turbine: 12 MW
1 extraction condensation turbine: 17 MW
District heating
capacity of cogeneration plant 110 MW
<