Project Assignment
Planning for a block-type thermal power station, waste dump
gas-fired
Contractor
Abfallwirtschaft Halle Lochau GmbH (a company operated
by the city of Halle)
ECH Services
Authorization
planning
Detail planning
Compilation
of the inquiry specification
Assistance
with contract awarding
Construction
monitoring
Site supervision
Processing Time
Authorization: 1993 - 1997
Construction: 1998 - 2000
Trial run and operation commencement: 2001
Short
Summary
From a disused strip mine, which has functioned since 1976
as a waste dump where 15 Mio. tons of waste
have been collected, the waste dump gas is to be utilized; waste gas is
sucked out, compressed and used
by gas engines for the production of power and, to a small degree, heat.
The
dump collects an annual
amount of 600,000 tons.The annual power generation is approximately 8,5
Mio. kWh. The electricity is fed
into the local network. Waste gas which has too low a methane content
is directed into a flare system and
burned at 1,200°C.
Technical Data
6,000
m gas drainage
64 gas wells
2,000 m main
lines
3,000 m flushing
and service lines
5 gas control
stations
Installation Technology
2
engines, each with a capacity of 500 kWel
4 sliding vane
rotary compressors, each with a transporting capacity of 800 m³/h
2 flare systems,
each with a combustion capacity of 500 m³/h
Complete stored
program control with overriding process control engineering.
<