Project Assignment
Implementation of an EDP-network infrastructure in a
university clinic complex made up of approximately 30
buildings. Planning of a multi-media communication network which can be
integrated.Contractor
Würzburg University Planning Department and Building
Control Office
Our
Services
Pre-planning
Design planning
Implementation
planning
Preparation
for contract awarding
Award assistance
Construction
engineering
Starting
Situation
The Würzburg University Clinic is a large clinic with
approximately 45 000 in-patients per year and approxi-
mately 1500 beds, spread out over approximately 30 buildings of different
ages and architectures.
Results
The concept includes the medical specialized areas as well
as the clinic administrative offices and the areas
for research and schooling. Objective was to be able to guarantee a secure
and efficient operational mana-
gement and to include the subsequent necessary measures, i.e. for electricity
supplying, fire protection, etc.,
in the guidelines for the realization of the concept. Both client and
user needs were taken into consideration
during the concept development process so that all requirements could
be met for an optimal use of the
system. The
entire concept was coordinated with the planning for the designated new
building area.
Processing Time
2003
Facts
and Figures
EDP-frame
Redundancy
concept
230V
for active components and equipment connections
Fire
detection system
Infrastructure
measures
Patient
TV
Time
recording system EDV-Backbone
EDP
in-house network
Uninterruptible
power supply (UPS) concept
EDP-suitable
lighting
Safety
concept
Telephone,
incl. billing system
Entrance
control system
Clocks
and meter system
<