Project
Assignment
Planning and supervision assistance for equipping the administration
center.Contractor
Hilti AG, Schaan
Our
Services
Planning and engineering assistance in equipping the administration
buildings of the management center
Starting
Situation
The Hilti Deutschland GmbH has been located for many years
in Kaufering (the upper part of Bavaria). This
well-known company produces assembly equipment, primarily elements for
mounting and fastening
technology. As part of the company's organizational development, it was
decided to centralize the main
administration of the German branch in Kaufering.
Results
20 kV transfer station out of the Lech-Elektrizitätswerke
network; peak load approximately 700 kW; lightning
conductor and grounding system; electric installation with route systems;
lighting systems; interruption free
electricity supplying with a nominal capacity of 250 kVa for the telephone
and computer systems; information
and communication technology (telephone, fire alert systems, alarm systems,
clock and meter systems,
intercom systems, entrance control systems); building automation; EDP
network with active and passive
components; transportation technology (4 elevators); fire protection measures
Processing Time
1998
Facts
and Figures
13.6000 m² useable floor space
approximately
250 places of work
62 Mio DM total
building cost
700 kW electrical
junction capacity
<