Project Assignment
Part-Desalination System and Thermal Degasification, Knoll
AG, LudwigshafenContractor
Knoll AG Ludwigshafen
BASF- Pharma
ECH Services
Concept
study
Authorization
planning
Implementation
planning
Compilation
of performance index for:
Machine technology
Electric and control technology
Construction management
Drawing up
request specifications
Bid comparison
Award assistance
Construction
supervision
Processing
Time
May 1998 thru February 2000
Starting
Situation
A hand operable one-line desalination system was being
used for the processing of the boiler feed water. The
thermal degasification system, the waste water processing system and the
boiler feed pumps were no longer
up to date.
The boiler house was changed over to 72 hours of non-supervised operations.
This lead to the decision to
plan and install a modern water processing system with thermal degasification
and waste water treatment.
The
economical aspect was taken into consideration in choosing between two
alternatives: a complete
desalination system, or a part-desalination system with reverse osmosis.
Result
From city water, part desalinated water is generated, having
a conductivity of approximately 60 µS/cm.
Warmed-up simultaneously with the condensates from the lye remover and
exhaust condenser, this supple-
ment water is fed to the degasification system. The part-desalination
takes place with ion exchanger.
The waste water from the boiler house and the regenerated water is neutralized
in a neutralization system.
Facts
and Figures
Equipment configuration:
De-carbonizing
system as twin system (2 x 20 m³/h)
CO2- Sprinkler
Softening system
as twin system (2 x 20 m³/h)
Thermal degasification
system (40 m³/h) with feed water vessel (30 m³) and 8 boiler
feeding pumps for
supplying 4 steam generating companies
Condensate
sump (20m³) with condensate pumps.
HCl- storage
and day vessels
Complete automatic
control
Operation and
observation monitor
<