|
||||||||||||||
|
||||||||||||||
|
||||||||||||||
Project Assignment Modernization (reconstruction and new construction) of the office building Süd 1 in Munich-Schwabing Contractor Münchener Rückversicherungs-Gesellschaft Scope of Project Processing power supply systems lighting systems, including facade art communication and information technology systems lightning protection and grounding systems electro-technical systems photo voltaic systems safety technology
Processing Time Planning invitation to tender site supervision Starting Situation The office building, originally erected in the 1970s, was no longer conform with current standards for economy and ecology. Instead of tearing the building down and rebuilding anew, the "Münchener Rück" company decided to have the building completely refurbished. The core of the building was to remain (fundament, supports, beams and ceilings). Result The new "Süd1" building which emerged sets new trends with regards to space economy, ac-commodations, aesthetic appeal and energy efficiency. It is recognized as being one of the ten most economic efficient office buildings in Germany. The main emphasis in the OvM planning was placed on the requirements for lighting installations and com- munication technology and on the conversion of energy (photo voltaic systems) and the furnishing of elevator systems. The photo voltaic system supplies the light installation, designed by a Danish artist, - light fibers in glass elements on the building front - with electric energy. Facts and Figures gross floor area approximately 20.700 m² 41,5 kW-Photo voltaic system, designed for 40.000 kWh/a lowering of energy consumption costs to a fourth of what it was in the old building total construction costs 44 Mio € < back |