Project Assignment Implementation of general modernization measures with special attention placed on fire protection and the removal of asbestos; measures to be carried out during non-interrupted hospital activity. Contractor Leopoldina-Hospital, City of Schweinfurt Scope of Processing constructional fire protection asbestos removal adaptation of the existing FMT- and ELT-installation with regards to current specifica-tions renewal and extension of the fire alarm system temporary measures using pre-assembled units
Processing Time Establishing fundamental principles, planning, invitation to tenders, placing of orders, site supervision (performance phases 1 - 9 according to HOAI § 73) Starting Situation The existing structural fire-proofing and the updated technical norm manual gave reason for the hospital management and controlling officials to examine the fire protection measures. As a result of the expertise, a number of new individual measures were initiated. Result fast and early recognition of fires by means of monitoring floors, hollow spaces of intermediate ceilings and all important rooms with the use of smoke alarms slowing down of fire spreading escape passageways in fire-resistant design establishment of direct escape passageways smoke-free holding by means of door controlling Facts and Figures hospital with 656 beds construction costs approximately 50 Mio. DM (approximately 25,6 Mio €) < back |