Project Assignment
Optimization of Energy Supplying and Purchasing
Contractor
Dalli-Werke GmbH & Co KG, Stolberg (laundry + personal
hygiene care)
ECH
Services
Concept
with technical supply alternatives
Technical and
economical evaluations
Personnel concept
Consulting
on energy purchasing
Ready for use
(turnkey) heating plant overhaul, including boiler, furnace, water treatment,
thermal
degasifying; comprehensive planning and authorization
procedures
Processing Time
November 1998 thru September 2002
Starting
Situation
The initial assignment of the project was the evaluation
of the economic efficiency of the own power
production currently in operations in view of new guidelines for energy
management and the liberalization
of the power market. The goal of the project was the reduction of at least
20% of the energy costs of the
Dalli plant site in Stolberg. Starting points were the analysis of existing
technical infrastructure and organi-
zation and the new design of the gas and power supply contracts. In addition
to the main plant in Stolberg,
two neighboring operations and four further sites of the Dalli Works were
integrated within the media supply
framework.
Result
The final analysis showed a savings potential of 30% by
shutting down the own power production and opti-
mizing the plant technology and organization. As a result of the sizable
natural gas savings potential, the
first reconstruction measures were carried out right away. The modernization
and optimization of the boiler
systems and water processing took place within five months after placement
of the order assignment and
without interrupting the routine heat supplying of the plant.
Facts
and Figures
Equipment configuration:
High-pressure
steam boiler, 10t/h, 13 bar with natural gas - light fuel oil firing
Retrofitting
of an existing steam boiler, 10t/h to a non-supervised operation with
new natural gas - light
fuel oil firing
new natural
gas - light fuel oil firing systems in the heating plant
completely
automatic twin operation of water processing as reverse osmosis system
for 5 m³/h, connected
with warming up and softening equipment
new thermal
degasifying system, twin operation, 2 x 12,5m³ contents, 2 x 18 t/h
nominal throughput (2nd
construction phase)
a ready for
operation implementation of systems
<