Project Assignment
Optimization of Energy Supplying and Purchasing

Contractor
Dalli-Werke GmbH & Co KG, Stolberg (laundry + personal hygiene care)

ECH Services
Concept with technical supply alternatives
Technical and economical evaluations
Personnel concept
Consulting on energy purchasing
Ready for use (turnkey) heating plant overhaul, including boiler, furnace, water treatment, thermal
     degasifying; comprehensive planning and authorization procedures

Processing Time
November 1998 thru September 2002

Starting Situation
The initial assignment of the project was the evaluation of the economic efficiency of the own power
production currently in operations in view of new guidelines for energy management and the liberalization
of the power market. The goal of the project was the reduction of at least 20% of the energy costs of the
Dalli plant site in Stolberg. Starting points were the analysis of existing technical infrastructure and organi-
zation and the new design of the gas and power supply contracts. In addition to the main plant in Stolberg,
two neighboring operations and four further sites of the Dalli Works were integrated within the media supply
framework.

Result
The final analysis showed a savings potential of 30% by shutting down the own power production and opti-
mizing the plant technology and organization. As a result of the sizable natural gas savings potential, the
first reconstruction measures were carried out right away. The modernization and optimization of the boiler
systems and water processing took place within five months after placement of the order assignment and
without interrupting the routine heat supplying of the plant.

Facts and Figures
Equipment configuration:
High-pressure steam boiler, 10t/h, 13 bar with natural gas - light fuel oil firing
Retrofitting of an existing steam boiler, 10t/h to a non-supervised operation with new natural gas - light
    fuel oil firing
new natural gas - light fuel oil firing systems in the heating plant
completely automatic twin operation of water processing as reverse osmosis system for 5 m³/h, connected
    with warming up and softening equipment
new thermal degasifying system, twin operation, 2 x 12,5m³ contents, 2 x 18 t/h nominal throughput (2nd
    construction phase)
a ready for operation implementation of systems

< back